Boiler Pickling
HOME Products ABOUT US Projects SERVICE BLOG & NEWS Contact Us Español Français Türkçe Português بالعربية English
Boiler Pickling
Home > BLOG & NEWS > Alloy Steel Pipe
Back

Boiler Pickling

Date:2018-03-06    View:4328  Tags:Boiler Pickling
Boiler pickling steps are as follows

First, start the pickling, boiler economizer, fill the inner cylinder and soften the water wall.

Then, the boiler's ignition operation, when the temperature rises to 170-180f boiler, boiler flame, then pickling operation. Before pickling, superheaters are also suitable for desalination backfill to water overflowing to prevent acid or acid vapor from entering the superheater.


When the boiler acid charge, anyway, the boiler should not be fired. Drums and other vents should be opened to expel the acid and iron in the hydrogen. Before the hydrogen has been dissipated, it is important to avoid open flame or sparking equipment to prevent the risk of hydrogen explosions.


Finally, after the acid filling is completed, the boiler and economizer are soaked in the solution for about 6 hours and then the acid is drained and rinsed with a deionized water superheater. Drain acid, the acid is discharged, the operation of the boiler feed pump, the capacity of the boiler filled water-saving, water cut-off valve to prevent leakage.
[Back]
related post
COPYRIGHT © 2016 ~ 2022 UNITED STEEL INDUSTRY CO., LTD, all rights reserved. www.united-steel.com
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.